New 2016 Projects

The 2016 projects will be listed below in categories based on the nature of the work being proposed. The three categories are Stormwater, Restoration, and Water Supply. Individual projects that have benefits in more than one category will be listed under each appropriate heading.

As of June 17, 2016 the Stormwater Projects have been listed.

As of June 24, 2016 the Restoration Projects have been listed.

As of July 18, 2016 the Water Supply Projects have been listed.

 

Stormwater Projects

The 2016 Stormwater Projects’ ranking sheet is available here.

Bijou Creek – Upper Glenwood

Bijou Creek – Pickett/Rufus Allen

Bijou Park Creek Watershed and SEZ Restoration

Chiapa Water Quality Project

Citywide Drainage Retrofits

Coldstream Road Open Bottom Culvert and Creek Restoration

Country Club Stormwater Management and Erosion Control Project

CSA 5 Water Quality Project

Delaware Water Quality Project

Donner Creek Interstate 80 Stormwater Project

Fremont Pipe Water Quality Improvement Project

Lake Tahoe BMP Implementation & Maintenance

Lake Tahoe Distributed Detention Basin System

Markleeville Creek Restoration

Martis Valley Groundwater Basin Planning & Restoration Study

Meyers SEZ and Erosion Control Project

Oflyng Erosion Control Project

Osgood Expansion

Regional Landscape Conservation Measures for Lake Tahoe

Ruby Way – Overlook Court

San Bernardino Water Quality Project

Sierra Boulevard

Sierra Tract Erosion Control Project, Phase 3/4

South Lake Tahoe Integrated Roadway Management Strategy

South Tahoe Greenway Trail

South Upper Truckee Water Quality Project

Stormwater Monitoring Program for the Lake Tahoe Basin

Tahoe Valley Greenbelt and Stormwater Improvement Project

TMDL Monitoring for the Truckee River

Town of Truckee Stormwater Management and BMP Retrofits

Town of Truckee Trash Control Program and Retrofits

Trout Creek Restoration

Truckee High School Stormwater Treatment Wetlands Restoration Project

Truckee River Legacy Trail

Truckee River Residential BMP Implementation

Upper Keller Canyon Drainage and Erosion Control Project

Water Quality Monitoring

West River Street Revitalization

 

Restoration Projects

The 2016 Restoration Projects’ ranking sheet is available here.

Aquatic Invasive Species Watercraft Inspection Program

BMP Implementation on STPUD Operating Site SWR WTR

Burton Creek Restoration Improvements

Carnelian Woods Tanks Site EIP

Chiapa Water Quality Project

Coldstream Road Open Bottom Culvert & Creek Restoration

Country Club Stormwater Management & Erosion Control Project

Delaware Water Quality Project

Development of Tools to Predict AIS

Donner Creek Confluence Floodplain Restoration Project

Dry Creek Restoration Project

Faith Valley Meadow Restoration

First 4 Mile Restoration Project

Glenridge Water Quality Project

Griff Creek Corridor Improvements

Groundwater Monitoring to Support Nearshore Management

Iroquois Pond SEZ Restoration

Johnson Canyon Westside Restoration

Kingswood West Tank Site EIP

Lacey Meadows Restoration

Markleeville Creek Floodplain Restoration Project

Martis Valley Groundwater Basin Planning & Restoration Study

Martis Watershed Restoration Plan Implementation

Meyers SEZ and Erosion Control Project

Non-Native Invasive Plant Species

Oflyng Erosion Control Project

Outback Watershed Improvement Project

Priority Meadow Restoration in the Carson Watershed

Priority Meadow Restoration in the Truckee Watershed

Regional Aquatic Invasive Species Prevention, Control & Monitoring

Regional Landscape Conservation Measures for Lake Tahoe

River Revitalization Project

San Bernardino Water Quality Project

Sardine Meadow Restoration

South Upper Truckee Water Quality Project

Squaw Creek Restoration, Olympic Valley, CA

Tahoe Pines Campground Restoration & Public Access

Transition Hazardous Fuels Reduction Project

Trout Creek Restoration

Truckee High School Stormwater Treatment Wetlands Restoration Project

Truckee Meadows Restoration

Upper Truckee River & Marsh Restoration

West Carson River Restoration

West River Street Revitalization

 

Water Supply Projects

The 2016 Water Supply Projects’ ranking sheet is available here.

Aquatic Invasive Species (AIS) Prevention – Middle Truckee River Watershed

Aquatic Invasive Species/Watercraft Inspection Program

Bunker Tank

Carnelian Woods Tanks Site EIP

City of South Lake Tahoe Landscape Irrigation Efficiency Upgrades

H-Street Zone/Improvement at the Y

Increase Capacity of Well #2 Wellhead Treatment

Install Wellhead Treatment for Well #1

Keller-Heavenly Zone Improvements

Kingswood West Tank Site EIP

Lawn Buyback Program

Markleeville Creek Floodplain Restoration Project

Markleeville Pipeline Replacement, Meter and Hydrant Installation

Martis Valley Groundwater Basin Planning & Restoration Study

Meter Conversion

Mountain View Well Ground Water Protections

MPUD Sewer Line Relocation

PCE Contamination Cleanup/Well Site Purchase/Location

Potable Groundwater Well Discharge Collectors

Regional Landscape Conservation Measures for Lake Tahoe

Regional Water Conservation Program

Regional Water Supply Interconnections

Southside Well Construction Water Dispensing System

Squaw Creek Restoration, Olympic Valley, CA

STPUD Waterline Replacement Projects

SVMWC & SVPSD Water System Interconnection Facility

Tahoe City Emergency Water Supply

Truckee River Operating Agreement – Instream Flow Enhancement

Upper Montgomery Booster, Zone Improvements

Water Pipeline Replacement Project

Waterline Replacement Project 2a

Waterline Replacement Project 7a

Well #4 Replacement and Treatment Project

Well Destruction Program

West Lake Tahoe Regional Water Treatment Plant

Woodfords Community Wastewater Infrastructure Upgrades

Woodfords Community Water Infrastructure Upgrades